  Silicon PU court  
 

Silicon PU court

Material  introduction

   The silicon PU course materials is the new materials containing silicone basing on the traditional PU materiais. Because of this,the material possesses the performance of bearing high teampure and microtherm and aging and Ozone .The material is inflaming retarding and nontoxic and no corrosion and physical inertia.

Material  properties

1. Professional performance: the coure is the construction of buffer layer and enhancement layer . because of this. athlete is comfort when sports.

2. Environmental: In our system. the material don’t contain benzene and free isocyanate and formaldehyde.

3. Utility capability: the material is colouful and antifriction and antiaging when solidifying in all kinds of climate. theconstruct is simple and easy on the base of concrete.

4. Scope of application: basketball field, tennis court, volleyball court, badminton court table tennis games, body leisure zone, Gym, sport site, etc.


Construction  points

1. Treating surface: The clean is essential with hydrochloric acid of 15% to new and old bedrock. After drying, It must that we deal with the expansion joint with the sealing glue,and the PU prime must be rolled for 1-2 times. The time is 6-8h (25℃) for drying.

2. Buffer layer construction: the buffer layer needn’t dilution with thinner, when construction, it must that water of 0.32% is added. After full stiring, the material is constructed the thickness is 1mm.The drying time is 6-8h (25℃).

3. Enhancement layer construction: the enhancement layer needn’t dilution with thinner, when construction, it must that water of 0.32% is added too. After full stiring, the material is constructed the thickness is 1mm.The drying time is 6-8(25℃).

4. Face lacquer constructing: the material of face lacquer is duuble component. In the course of construction A and B must be mixed. After full stiring, It must be rolled for 1-2 times. The time is 4-6h(25℃) for drying.

5. Lineation: According to standard size , the lineation is used.

6. Evironment requirement : The high and low temperature and raiy weather should be avirded.